Gold Member Since 2016
Audited Supplier
Qingdao Kaijie Heavy Industry Machinery Co., Ltd.

Provided with Process, Water Circulating System, Responsible for The Installation manufacturer / supplier in China, offering V-Process Production Line/Suitable for The Large Casting, V Method Molding/Low Price /Good Quality, Steel Ladle Preheater/ Iron Ladle Pre-Heating System Used in EPC Casting and so on.

(/ )

Supplier Homepage Product Vacuum Method Casting V-Process Production Line/Suitable for The Large Casting

V-Process Production Line/Suitable for The Large Casting

FOB Price: US $80,000-800,000 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $80,000-800,000/ Piece
Get Latest Price
Port: Qingdao, China
Production Capacity: 5PCS/Month
Payment Terms: L/C, T/T, Western Union, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: KJ63
  • Automatic Production Line: Assembly
  • Automation: Non Automation
  • Rhythm: Flow Production Line
  • Design: for Free
  • Warranty: 12months
  • Trademark: Kaijie
  • Specification: 2-45pcs/hour
  • HS Code: 8454309000
  • Transmission Type: Flexible
  • Certification: ISO, CE
  • Flexible Production: Agile Manufacturing
  • Production Scope: Product Line
  • Inspection: Third Party
  • Color: Free According to The Customer
  • Transport Package: Plywood Case or Customers Demands
  • Origin: Shandong, China
Product Description
Vacuum Process Molding:

Filled dry sand(without adhesive,no mixing)in the flask,both sides of flask are covered with plastic film,and evacuated air inside,under a certain vacuum condition sand will lose relative motion,and then forming a mold.

The principle of V-process:
1.Pattern and film heating
1)Fix pattern on the pattern carrier,and drilling holes on the pattern.
2)Heating the film.
3)Cover the heated film on the pattern.

2.Film forming and spraying coating.
Sparying coating on the formed film.

3.Place the flask
1)Keep the pattern carrier under negative pressure.
2)Putting the flask on the pattern which had covered by film and coating.

4.Vibrating and sand filling
1)Keep the pattern carrier under the negative pressure.
2)Filling the dry sand of appropriate mesh into the flask.
3)Vibrating to improve sand density.

5.Covering back  film
1)Buldozing the surface of mold.
2)Covering the plastic film on the back of flask.
3)Connected the flask with the vacuum system.

6.Stripping
1)Relieving negative pressure of pattern carrier,pattern lose the attraction of EVA film
2)Stripping,and then molding completed.

7.Assembling flask and pouring
1)Molding the upper part and low part mold inthe same way.
2)Assembling flask with dowel pins,fastening the upper and lower parts.
3)Pouring under negative pressure.

8.Shakingout
1)After cooling for a specific time,relieved negative pressure of flask,sand wikll fall down with cast under normal pressure.
2)Sundries(like waste plastics,iron slag)are sieved from sand,sand will be reused after cooling.



OTHERS:
We welcome you visit our company and expect your cooperation .
Any question, please feel free to contct us
Sales: Lina Chen
Tel :+86 13589308133/  +86-532-86239667
Website: www.qdkaijie.com 

 
Send your message to this supplier
Avatar
Miss lina
Foreign Trade Worker
*From:
To: Miss lina
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now